News
Groundbreaking ceremony
On November 15, 2024, the groundbreaking ceremony for THEISSL Systems GmbH took place in a new industrial and commercial area opposite the new ÖBB train station, located between Styria and Carinthia. Construction began in December 2024, and completion is planned for December 15, 2025.

Foto: Studio 4
November 15th, 2024

October 30th, 2024
VW ID.3 on the Grossglockner
A test drive was carried out at the end of October to demonstrate the use of the measurement technology on the “Glocknerstraße” test route.
Company construction, first steps
The plot of land for the construction of the company building was recently acquired. Construction work will start soon.

October 2024

September 2024
VW ID.3, the measurement demonstrator vehicle
Our VW ID.3 is equipped with our telemetry measurement technology and impressively demonstrates the measurements and data analyses that are possible in a vehicle.